LS GreenSync

Government Approved

PM SURYA GHAR YOJANA

Government Solar Subsidy Scheme

Get up to 40% subsidy on residential solar panel installation through the Government of India's PM SURYA GHAR YOJANA scheme. LS GreenSync is an authorized provider offering complete end-to-end solar solutions with maximum subsidy benefits.

40%
Max Subsidy
25 Years
Warranty
19-22%
Efficiency
3-5 Days
Installation
PM SURYA GHAR YOJANA Solar Scheme
Central Govt. Scheme
MNRE Approved

PM SURYA GHAR YOJANA Benefits

Comprehensive benefits under the Government of India's flagship solar scheme for residential consumers

40% Subsidy Support

Get up to 40% subsidy on solar panel installation cost for residential properties up to 3 kW capacity

25-Year Warranty

Comprehensive 25-year performance warranty on solar panels and 5-year warranty on inverter and battery systems

Reduced Electricity Bills

Save up to 90% on monthly electricity bills with net metering and solar energy generation

Easy Financing

Collateral-free loans from nationalized banks with attractive interest rates and flexible repayment options

Free Maintenance

5 years free maintenance service including regular cleaning, performance monitoring, and technical support

Quick Installation

Complete installation within 3-5 working days with certified technicians and quality equipment

Government of India Initiatives

PM SURYA GHAR YOJANA is part of India's commitment to renewable energy and sustainable development

Ministry of Power

Implementing Authority

MNRE

Renewable Energy

DISCOM

Power Distribution

State Govt

Andhra Pradesh

RBI

Financing Support

BEE

Energy Efficiency

National Solar Mission

PM SURYA GHAR YOJANA is a flagship initiative under India's National Solar Mission, aiming to promote solar energy adoption across residential sectors with substantial government support and incentives.

Central Government Scheme with 40% subsidy
Implemented through State Nodal Agencies
Bank financing support with collateral-free loans
Technical standards and quality assurance

Official Scheme

Government of India Approved

MNRE Certified

Solar Installation Across Andhra Pradesh

Professional solar panel installation services in major cities and districts across Andhra Pradesh with PM SURYA GHAR YOJANA subsidy benefits

Anantapur District

  • Kadiri - Our Headquarters
  • Anantapur City
  • Hindupur
  • Dharmavaram

Rayalaseema Region

  • Kurnool City
  • Nandyal
  • Chittoor
  • Tirupati

Coastal Andhra

  • Vijayawada
  • Guntur
  • Nellore
  • Ongole

Uttarandhra Region

  • Visakhapatnam
  • Vizianagaram
  • Srikakulam
  • Anakapalli

Major Cities

  • Amaravati
  • Eluru
  • Rajahmundry
  • Kakinada

Industrial Areas

  • Sri City (Tirupati)
  • APIIC Zones
  • Pharma City (Visakhapatnam)
  • Industrial Estates

Serving all 13 districts of Andhra Pradesh with professional solar installation services

Complete Installation Process

Step-by-step guide from application to commissioning under PM SURYA GHAR YOJANA

1

Site Survey & Assessment

Technical team visits your location for comprehensive site assessment including roof condition, shadow analysis, and energy consumption evaluation.

Duration: 1-2 days
2

System Design & Proposal

Customized solar system design based on your energy requirements, roof space, and budget. Detailed proposal with cost breakdown and subsidy calculations.

Duration: 2-3 days
3

Documentation & Application

Complete documentation preparation including subsidy application, net metering application, and necessary permits. We handle all paperwork.

Duration: 3-5 days
4

Subsidy Approval & Sanction

Follow-up with DISCOM for subsidy approval and sanction. Once approved, we proceed with material procurement and installation scheduling.

Duration: 7-10 days
5

Professional Installation

Certified technicians install solar panels, inverter, battery system, and complete electrical integration with safety measures and quality checks.

Duration: 3-5 days
6

Inspection & Commissioning

DISCOM inspection, net meter installation, system testing, and final commissioning. Training provided for system monitoring and maintenance.

Duration: 2-3 days

Timeline Overview

Total Process Time 15-25 Working Days
Application to Approval 7-10 Days
Installation Time 3-5 Days
Inspection & Commissioning 2-3 Days
Warranty Period 25 Years

Required Documents

  • latest Electricity Bill
  • Aadhaar Card
  • Property Documents
  • Bank Account Details
  • PAN Card
  • Photographs

Technical Specifications

High-quality solar equipment with advanced technology and reliable performance

Solar Panels

  • Type: Mono/Poly Crystalline
  • Efficiency: 19-22%
  • Warranty: 25 years
  • Certifications: IEC, MNRE

Inverter System

  • Type: String/On-Grid
  • Efficiency: 97-99%
  • Warranty: 5-10 years
  • Protection: IP65 rated

Battery System

  • Type: Lithium-ion
  • Capacity: 5-10 kWh
  • Warranty: 5-10 years
  • DOE: 80-90%

Check Your Eligibility

Find out if you qualify for PM SURYA GHAR YOJANA subsidy and get a free consultation

Eligibility Criteria

Residential Property Owner

Must own the residential property where solar installation is planned

Valid Electricity Connection

Should have a valid electricity connection from the local DISCOM

No Existing Solar System

Should not have availed any previous solar subsidy from the government

Required Documents

Aadhaar card, property documents, electricity bill, bank details

Get Free Consultation

Our solar experts will assess your requirements and guide you through the complete process

Ready to Go Solar?

Get a free consultation and quote for your solar installation. Let us help you save on electricity bills with government subsidies.

Get Free Solar Consultation